Community Facility Projects - Madeley - Kingsway Dog Exercise Area fencing

Location
Suburb Madeley
Ward South Ward
Key Facts

Stage 1 (COMPLETE)

  • Installation of 1200mm chainmesh perimeter fencing.
  • Installation of box gate system and concrete hardstand
  • Construction of mulched area with informal limestone seating

Stage 2    

  • Installation of perimeter fence and gate for additional small dog area as annex to main area
  • Installation Dog Agility Equipment in both areas
  • Installation of Water Fountains to both areas
  • Installation of Sand-Play areas to both areas
Completed Stages

Stage 1 : 

  • Construction of perimeter fencing and associated gate system and informal mulched seating area.

Stage 2 : 

  • Concept Plan 
Current Stage

Commencement of Stage 2 (Small Dog Area) May/June 2018.

The scheduled works are within the Small Dog Area with the installation of:

  • 1200mm chainmesh fencing and gate systems surrounding the Small Dog Area.
  • Sand play area with limestone edging.
  • Mulch areas with concrete edging.
  • Informal limestone seating.
  • Information signage to both the Small Dog Area and All Dog Area.
Upcoming Stages
  • Stage 1 and 2 installation of drink found.
  • Extension of existing mulched area.
  • Installation of agility items.

 

Expected Date of Completion Stage 1 - Completed 2017. Stage 2 - July 2018