If you are undertaking building or demolition works, find out when a Street and Verge Bond Permit is required, what you need to submit, and how bond refunds are processed.

About a street and verge bond

A Street and Verge Bond protects public infrastructure such as footpaths, kerbs, drainage and road surfaces during building or demolition works. It provides financial security if damage occurs. 

A Street and Verge Bond Permit is required for all approved building and demolition works in the City.

Fees and bond amounts

Fees may change without notice.

Value of works up to $20,000

  • Administration fee: $140 (non-refundable).
  • Bond: Not required.

Value of works $20,000 or more

  • Administration fee: $140 (non-refundable);
  • Bond: $2,200 (refundable).

Secondary inspection fee

  • Secondary inspection fee: $60 (if inspection cannot be completed).

Permit requirements

The following information is required to obtain a Street and Verge Bond Permit:

  • A Pre-Construction Inspection Report.
  • Payment of the non-refundable administration fee.
  • Payment of the refundable bond (if required).

Before construction starts, the responsible person (the building or demolition permit holder) must submit a Pre-Construction Inspection Report. 

The report must include:

  • Date-stamped photos of all adjacent verges.
  • Images clearly documenting any existing damage.
  • Coverage of footpaths, kerbs, crossovers, road surfaces and drainage points.

This report is used to compare against the post-construction inspection to identify any new or additional damage.

Note: The City may also conduct its own pre-construction inspection.

Submit Pre-Construction Inspection Report

Apply for the permit via the online form link below.

Note: If you have already lodged a Building Permit or Demolition Permit application, your Street Verge Bond Permit application has been submitted automatically as part of that process. All applicable permit fees, including the administration fee and bond, are incorporated and paid directly through your primary permit application.

Apply for Street Verge Bond Permit

After works are completed

When the works are finished, submit a Notice of Completion (BA7).

Once the City has acknowledged receipt of this form, you may lodge your bond refund request. You can submit the BA7 online form via the link below.

Alternatively, you can download the Notice of Completion (BA7) form in Word or PDF format from the WA Government website. Submit it via:

  • Option 1 – In person: Download and complete the Notice of Completion (BA7) form then submit it at the City of Wanneroo Civic Centre, 23 Dundebar Road, Wanneroo. Business hours are Monday-Friday, 8.30am-5pm.
  • Option 2 – By post: Download and complete the Notice of Completion (BA7) form, then mail it to City of Wanneroo, Locked Bag 1, Wanneroo WA 6946.

Note: Wait for the City’s acknowledgement before progressing to the next step.

Submit a Notice of Completion

Submit a Post-Construction Inspection Report confirming the final condition of verges and adjacent infrastructure.

Submit a Post-Construction Inspection Report

To apply for the return of the bond, you will need to include:

  • Building or demolition permit number
  • Street and verge bond receipt
  • Acknowledgement of your Notice of Completion

Apply for the return of the bond

Assessments, cancellations and refunds

The City will assess the site by comparing the pre-construction and post-construction reports.

  • If no new damage is identified: The bond will be refunded
  • If damage is found:The City will provide an estimated repair cost. You may choose to:
    • Complete the repairs yourself to the City’s standards
    • Authorise the City to carry out the repairs (costs deducted from the bond)

If repair costs exceed the bond amount, the remaining balance will be invoiced.

Note:

  • Refunds typically take 6 to 8 weeks
  • If the bond is to be refunded to someone else (such as a client or third party), a signed letter of authorisation is required

If your building or demolition permit is cancelled, include the City’s written acknowledgement of the cancellation when requesting a refund.