Yanchep-Two Rocks Development Contribution Plan (DCP) - Annual Review of Costs (2021-2022)

Community engagement has now closed. Comments were submitted from 10/09/2021 to 14/10/2021.

Information

The Yanchep-Two Rocks DCP was established in 2014 to collect financial contributions from developing landowners towards the cost of delivering district level community facilities in the Yanchep-Two Rocks area.

The City’s District Planning Scheme No. 2 (DPS 2) requires that any estimated costs included in the DCP be reviewed at least annually to ensure that they are as accurate as possible.

The City has completed its annual review of the Yanchep-Two Rocks DCP and Council considered this matter at its meeting on 7 September 201 (PS03-09/21). At this meeting Council endorsed the revised Yanchep-Two Rocks DCP cost estimates for the purpose of public consultation, which includes a revised facility cost estimate of $27,931,551 and a per lot contribution rate of $3,909.23

Please refer to the revised DCP Report for details 

To comment

Submissions on the annual review may be lodged in writing to the Chief Executive Officer, City of Wanneroo, Locked Bag 1, Wanneroo WA 6946 or email: enquiries@wanneroo.wa.gov.au on or before 14 October 2021.