Road Projects - Madeley - Hepburn Avenue renew asphalt - Spectator Drive to Hartman Drive
Project description |
The 690m long site is on Hepburn Ave eastbound carriageway between Spectator Dr to Hartman Drive. The site consists of a 19 year old asphalt surface with cracking and rutting throughout the site. The inspections and analysis indicate that the existing surface has reached terminal age and requires resurfacing. |
---|---|
Expected Date of Completion |
June 2023. |
Status |
Construction. |
Map | |
Suburb | Madeley |
Ward | South-West |
Completed Stages |
Design and pre-planning. |
Upcoming Stages |
|
Enquiries |
Ph: 9405 5000 Page last updated: 5 April 2023 |