If you plan to construct, alter, extend or repair a building or structure, you may need a Building Permit. Find out about the difference between certified and uncertified applications and how to apply.

About Building Permits

Building Permits are required for most construction, renovation and structural work to ensure projects comply with the National Construction Code and relevant building standards. This helps protect public safety, structural integrity, and property value. Some projects may also require Development (Planning) Approval or Health Approval.

Both applications can be lodged at the same time, however, a Building Permit cannot be issued until all required approvals have been granted.

Types of Building Permits

Before you start: approval requirements

Before preparing your Building Permit application, ensure you understand all approval requirements that may apply to your project.

Many projects require Planning Approval, Building Approval, and, in some cases, Health Approval.

Refer to the following sections to determine what applies to your project:

If you are unsure which approvals you need, please contact the City before starting your application.

Step 1: Prepare your application

Note: You will need to engage a registered building surveyor to assess your building plans. The surveyor will issue a Certificate of Design Compliance (BA3) if the plans meet all building codes and regulations. This certificate is required as part of your application.

You will need to complete and submit the following:

  • Application for Building Permit – Certified (BA1) form.
  • Site plans, specifications, and technical documents (refer to the residential checklist where applicable).
  • Payment of relevant fees (see below).
  • Development Approval (if required).
  • Street and Verge Bond Permit application (see below).

Certified Residential Building Permit Checklist

You will need to complete and submit the following:

  • Application for Building Permit – Uncertified (BA2) form
  • Supporting documents as outlined in the checklist below
  • Payment of relevant fees (see below)
  • Street and Verge Bond Permit application (see below)
  • Development Approval (if required)

Uncertified Building Permit Application Checklist

Building Permit fees vary depending on the type and value of the works.

Refer to Building Fees Schedule and Calculator.

When applying for a Building Permit, you must also submit a Street and Verge Bond Permit Application. This includes a non-refundable administration fee and a refundable bond based on the value of works.

For details, visit the Street and Verge Bond Permits page.

Step 2: Submit your application

You can submit your Building Permit application:

  • Online: via the City’s online application portal
  • In person: City of Wanneroo Civic Centre, 23 Dundebar Road, Wanneroo
  • By mail: City of Wanneroo, Locked Bag 1, Wanneroo WA 6946

Note: A completed BA1 form or BA2 form must be uploaded or attached with all submissions.

Step 3: Application processing

Once your application and payment have been received, the City will assess your submission.

Processing timeframes

  • Certified applications: within 10 business days
  • Uncertified applications: within 25 business days

If further information is required, you will be contacted. The requested information must be provided within 21 days or within an agreed timeframe.

Step 4: Post-construction requirements

Upon completion of construction, the builder must submit a BA7 Notice of Completion within seven days of completing the works.

You can submit your Notice of Completion:

  • Online: via the City’s online application portal
  • In person: City of Wanneroo Civic Centre, 23 Dundebar Road, Wanneroo
  • By mail: City of Wanneroo, Locked Bag 1, Wanneroo WA 6946

This finalises the Building Permit.

Note: A completed BA7 form must be uploaded or attached with all submissions. Building forms can be accessed on the WA Government Building Approvals page.

Other permits, certificates and notices

Under the Building Act 2011 and Building Regulations 2012, an Occupancy Permit is required for all Class 2 to Class 9 buildings in Western Australia.

An Occupancy Permit is required before a Class 2-9 building can be occupied. Occupying a Class 2-9 building without an Occupancy Permit may result in penalties under the Building Act 2011 and Building Regulations 2012.

Complete the occupancy permit online form

You need a Demolition Permit for any complete or partial demolition, dismantling, or removal of a building or incidental structure. This includes buildings like sheds, patios, and pergolas, though some exemptions apply.

Complete the demolition permit online form

To change or extend your existing permit approval, you can apply to the City for an amendment or extension.

To find out more refer to the Amendment and Extension of Building Application page.

A Notice of Cessation is used to advise the City that building work approved under a building permit has permanently ceased before the project has been completed.