If you are planning to divide land into new lots or amalgamate lots, learn how the subdivision process works and when the City becomes involved.
Types of subdivision
- Freehold (Green Title): Creates separate lots under individual freehold title with no common property.
- Survey-Strata: Creates lots defined by surveyed land boundaries. Survey-strata may include common property or be designed without common property. A strata company may be established and by-laws can apply.
- Built Strata: Creates lots defined by the cubic space of buildings and structures, rather than surveyed land boundaries. Built strata is typically used for developments where ownership is based on parts of a building such as apartments or commercial buildings. Refer to the Strata Scheme (Built Strata) Subdivision page for details.
When the City becomes involved
In Western Australia, all subdivision applications are lodged with and determined by the Western Australian Planning Commission (WAPC). The City's roles are to:
- Assess WAPC referrals: Review subdivision proposals against the Local Planning Scheme and relevant planning framework and provide a recommendation to the WAPC.
- Clear subdivision conditions: Confirm that local government conditions have been satisfied before the WAPC grants final approval.
All other stages of the subdivision process are managed by the WAPC or Landgate.
Lodgement process
All applications to the WAPC must include a subdivision plan prepared in accordance with WAPC guidelines.
Licensed land surveyors can prepare plans and lodge applications on your behalf.
Note: The City cannot recommend surveyors.
For more information and to apply visit the WAPC website.
If supported, the WAPC will grant conditional approval. All conditions must be “cleared” before new titles can be created within the approval period.
Approval validity:
- 4 years (more than five lots);
- 3 years (five lots or fewer).
You may request the WAPC to reconsider your subdivision determination, including any conditions of approval, within 28 days of the determination date.
If you are still dissatisfied with the outcome, an appeal may be lodged with the State Administrative Tribunal within 28 days of the reconsideration decision.
Most conditions require works such as roads, drainage, earthworks or services.
These must be completed before applying for subdivision clearance. Whether constructing an access leg to a second dwelling at the back of your property or a road serving 20 dwellings, engineering approval is required to ensure that adequate drainage and road surface treatments are provided.
Before new titles can be created, all conditions on the WAPC subdivision approval must be “cleared” by the authority listed next to each condition (e.g. Local Government, Water Corporation, Main Roads).
Subdivision clearance is the process of confirming that those conditions have been met. The City can only clear the conditions assigned to Local Government.
Once all works relating to the City’s conditions are complete, you may apply to the City for subdivision clearance.
See below for what to submit and how to apply.
Once all the relevant authorities (e.g. Water Corporation, Western Power) conditions, including the City’s, are cleared, the WAPC issues final endorsement of the Deposited/Survey-Strata Plan.
After endorsement, lodge the plan with Landgate for new titles to be issued.
Subdivision clearance
Items to address before applying for subdivision clearance
Before lodging a subdivision clearance application with the City, the conditions should be addressed prior to lodgement.
A full list of common subdivision conditions and their clearance requirements, including what documentation would need to be supplied to demonstrate it has been addressed, can be accessed here:
If your WAPC approval includes a condition requiring payment of developer contributions:
- Refer to the City’s Developer Contribution Scheme Rates, or
- Request a tax invoice by emailing schemecontributionsenquiries@wanneroo.wa.gov.au.
Developer contribution payments must be made before lodging your clearance application.
Supervision fees must be paid prior to lodgement:
- 1.5% of all roadworks and drainage works
- When calculating the 1.5% supervision fee, include 15% of the total contract earthworks sum.
Before applying for clearance, contact the City’s Land Development team to arrange an onsite Practical Completion Inspection via email, unless a bond for outstanding works has been accepted.
A copy of the PCI report will be issued to the developer/engineer.
If bonding is permitted for outstanding works:
- Submit a Subdivision Bond Application (original signature required)
- Bonding must be lodged before submitting the clearance application.
The City will not accept bonds for works on private land (e.g. retaining walls, fencing, battleaxe legs, revegetation).
Subdivision Bond Application Form (PDF) Subdivision Bond Refund Form [PDF]
Where required, geotechnical reports must be prepared and certified by a suitably qualified professional and submitted to the City’s Land Development team before applying for clearance.
If your subdivision conditions require legal documentation to be executed, such as an easement, caveat, restrictive covenant, deed of agreement, or Section 70A Notification, please submit the following documentation to approvals@wanneroo.wa.gov.au:
- Cover letter.
- A copy of the subdivision approval.
- A copy of the documents for execution.
- A copy of the proposed Deposited/Survey-Strata Plan.
Please ensure all required documentation is submitted before lodging your clearance application.
For conditions relating to sewage treatment systems:
- Determine whether an on-site sewage treatment system exists or previously existed.
- If City records show no system was ever installed, provide a written statement confirming this (noting you must also confirm no unapproved systems are present).
- If a system exists and is to remain:
- Submit a scale plan (1:100) showing the exact location of all components, boundaries and structures.
- Ensure required setbacks are met (contact the City’s Environmental Health team for advice).
- If a system is still in place but is to be decommissioned:
- Submit a Certificate of Decommissioning before lodging the clearance application.
- If a system was previously decommissioned without a Certificate:
- Provide a Statutory Declaration confirming all reasonable efforts have been made to locate the system and confirming it is no longer in situ.
Subdivision clearance application requirements
You must upload the following documents with your application:
- Subdivision clearance application form and checklist (completed as part of the online lodgement).
- Diagram or plan of survey (Deposited/Survey-Strata Plan).
- WAPC Subdivision Approval.
- Supporting information demonstrating how each Local Government condition has been met.
- Staging Plan (if applicable) – if the subdivision is staged, deposited plans must be clearly identified on the WAPC-approved plan and accompanied by a Staging Plan.
- Payment of the subdivision clearance application fee (refer to Item 5 in the City’s Planning Fees Schedule). Note: These fees are not payable for public open space, drainage, common property or balance title lots.


